Series GJK□-□/PC rectification control unit(Used for series MCOI ore self-recovering separator)
Location: Products/Separator/Series GJK□-□/PC rectification control unit(Used for series MCOI ore self-recovering separator)
Features:
.

General description:

This series control unit consists of rectification program control panel and operational chamber. The program control and the time setting adopt PC control; the rectified current is adopt the various voltage transformer branch to change the voltage in the silicon rectification strong & weak excitation way. It convenient for commissioning and test run, its working performance is reliable and steady.

 

Program control panel                                                               Operational panel

 

    Pattern selection & attention

When choosing series MC01 ore self-recovering separator, according to the principle the max cold state power consumption of the corollary separator should not be over the rated capacity of the equipment.

 

            Main technical data

Model

 

Data

Input AC noltage

(V)

Output DC

Voltage

(V)

Capacity

(kw)

External & installation dimension (mm)

Weight

(kg)

W

D

H

X

Y

Rectification

Program

Control

panel

GJK-PC

380

350/290/100/90

15/10.3/1.22/0.9

1020

600

2060

920

460

280

GJK-PC

20/13.5/1.63/1.32

GJK-PC

25/17.12/2.04/1.65

GJK-PC

35/24/2.85/2.31

1200

2260

1120

300

GJK-PC

45/30.5/3.67/2.97

350

GJK-PC

65/44.6/5.3/4.29

360

GJK-PC

100/68.5/8.1/6.61

380

GJK-PC

120/82.3/9.79/7.93

400

Operational

chamber

CX-1/PC

380

 

 

580

340

700

540

400

65

Note: 1. The 4 values on the capacity column means rated output capacity of equipment at different outputting voltage.

 2. The rectification voltage transformer is installed outside when the equipment's max capacity exceeds 45KW.

 

Corollary metal detector and user signal connect handing over sketch

Model

Hand-overt point signal

Sets of metal detector

note

Iron detect

Metal detect

Iron detect

Metal detect

GJK1-/PC

1.        ready for operation

2.        main loop trouble

3.        detector trouble

4.        separator running

5.        metal detecting

6.        continuous metal detecting

7.        continuous metal transferring belt stop interface

1.        ready for operation

2.        main loop trouble

3.        detector trouble

4.        separator running

5.        metal detecting

6.        continuous metal detecting

7.        continuous metal transferring belt stop interface

1 set

2set

1.        the required signal can be wired into the main control chamber per the customers site operating conditions

2.        the operational panel has control buttons as well as signal display

GJK21-/PC

2set

4set

GJK22-/PC

Note: 1. Iron picking up in column of Interface signal refers to detecting among the magnetic materials and removing the iron pieces; " Metal Picking Up"  refers to detecting the magnetic metal (such as iron pieces) as well as non-magnetic metal (such as high manganese steel), and the magnetic metal auto picked up by the iron separator, the non-magnetic metal can only be manually picked up when the material conveyer is conducted to stop.

2. The output signal interface is for passive contact. " Belt Stop"  interface are of a pair of normal open passive contact and a pair of normal close passive contacts. The other interfaces in principal are a pair of normal open passive contacts.